Thanet Fibre Optic
Brief
Challenge
Solution
FGS Rentals was central to the operation, supplying excavators that served as fixed anchor points for the pulley system used in the subsea cable pull. These were carefully positioned to act as static deadweight’s, enabling the controlled movement of the fibre optic cable from offshore, through to the tunnel system, and into the onshore concrete chamber. FGS Rentals also provided tower lights to ensure the site remained safely operational around the clock.
Four Jays Group delivered all welfare units and infrastructure for the project. This included a 24-foot static canteen split unit, a 24-foot mobile welfare unit, a 12-foot towable office, Heras fencing for perimeter security, and on-site toilets – ensuring the workforce was fully supported with high-quality facilities throughout the works.
FGS Industrial deployed a confined space team of three specially trained operatives to assist with the internal pull of the cable through the tunnel into the chamber. Their expertise and strict adherence to safety protocols ensured the site remained ready for confined space operations at all times.
To support access and site setup, FGS Utilities provided temporary access trackway, installing 80 H-Mats in an L-shaped formation, creating a stable base for welfare units, lighting towers, toilets, and skips, while Countrystyle Recycling completed the service with responsive waste management.
Outcome
Through close collaboration across the Heathcote Holdings group, the Joss Bay project was delivered with a strong focus on safety, efficiency, and environmental responsibility. The multi-disciplinary support ensured operational readiness across all areas, from plant machinery services to confined space capability and welfare provision, contributing to a smooth and well-coordinated cable installation.
Our customer commented:“Dealt with all our requirements quickly, delivered on time. Perfect services all round.”