Showing all 4 results
-
Temporary Access Trackway

Heavy Duty – TuffTrak
UHMWPE mats forming a temporary roadway for construction traffic and heavy plant. Each panel covers 7.5sqm and supports loads of up to 150 tonnes, spreading vehicle weight to prevent rutting on soft ground. FGS installation only, available on short or long-term hire.
Hire Now -
Temporary Access Trackway

Heavy Duty Overlap
Our most robust option. Overlapping HDPE boards create a continuous roadway with no gaps, rated to a maximum load of 420 tonnes for cranes, HGVs and heavy site traffic. High-visibility orange finish. FGS installation only, for construction and infrastructure projects.
Hire Now -
Temporary Access Trackway

Light Duty – Trackway Pro-T (walkway)
Rubber pedestrian walkway panels for grass and uneven ground. At 20kg each, panels are easy to lay and reposition, with a slip-resistant surface and a maximum load of 10 tonnes. Suited to weddings, events and visitor routes. Available for customer or FGS installation, on short or long-term hire.
Hire Now -
Temporary Access Trackway

Medium Duty – Euromat
Abutted plastic boards for event car parks, access routes and walkways. Each panel covers 2.88sqm, weighs 32kg and supports loads of up to 80 tonnes, handling cars, vans and light plant while protecting the ground beneath. Customer or FGS installation, with flexible hire periods.
Hire Now
Trackway for every sector
From utilities and construction to events and environmentally sensitive sites, we tailor each trackway solution to your sector’s specific demands.
- Utilities & Infrastructure – Reliable access for gas, water, electric and telecoms works, protecting surfaces and reducing reinstatement costs.
- Construction & Civil Engineering – Safe access for heavy plant and site traffic across haul roads, compounds and crane pads.
- Environmental & Sensitive Sites – Minimal ground impact for wetlands, archaeological sites and SSSIs.
- Renewable Energy – Low-disturbance access for solar and wind farm construction and maintenance.
- Events & Outdoor Venues – Safe vehicle and pedestrian access for festivals, sporting events and temporary car parks.
How it works
We start with a project consultation to understand your load, ground conditions and timescales, followed by a site visit to assess access constraints and safety needs. You’ll get a clear, tailored proposal, and our team coordinates installation to fit your schedule.
More than trackway
As part of Heathcote Holdings, we can also support your site with traffic management, lighting, plant, and vegetation clearance, giving you one trusted partner for the whole project.